Reference
Isonkyrön seurakuntatalo
Client: Isonkyrö Parish
Construction period: 10/2024–03/2025
The project included construction management and supervision tasks related to water damage repairs. At the same time, the stormwater and drainage lines were renovated. In addition, ventilation system surveys were carried out, and improvement proposals were prepared based on the findings.
Comse Oy carried out project management duties, construction supervision, and HVAC expert tasks for the site.
